What Documents Does Your Planning Application Need?
Answer a few quick questions about your development and get an instant checklist of the documents you're likely to need. This is generic national guidance — your local council may require more.
What type of development is it?
Full Library of Planning Validation Requirements
Every document a UK planning application might need — from the basics to the specialist reports that support major applications, including Biodiversity Net Gain (BNG) metrics, Sequential Tests, and Noise Impact Assessments.
Completed application form
Always requiredThe relevant application form (householder, full planning, listed building consent, etc.) completed in full.
Correct application fee
Always requiredPlanning application fees are set nationally and vary by development type and scale — paying the wrong amount will stop your application being registered.
Ownership certificate
Always requiredA signed certificate (A, B, C or D) confirming ownership of the site, with notice given to any other owners where required.
Site location plan
Always requiredAn up-to-date, scaled plan (typically 1:1250 or 1:2500) showing the application site edged in red.
Existing and proposed plans, elevations and sections
Always requiredScaled drawings showing the development as it exists now and as proposed, consistent with the application description.
Certificate / evidence of current lawful use
Always requiredFor change of use applications, evidence establishing the site's current lawful use class.
Heritage Statement
Always requiredAssesses the impact of the proposal on a listed building's significance or on a conservation area's character.
Learn more →ICNIRP certificate of compliance
Always requiredCertifies that a telecommunications mast or apparatus complies with international guidelines on public exposure to radio frequency emissions.
Design & Access Statement
Often requiredExplains the design approach and access arrangements. Required for major development and, in most councils, for applications affecting listed buildings or conservation areas.
Biodiversity Net Gain (BNG) Metric
Often requiredSince February 2024, most developments in England must demonstrate a measurable biodiversity net gain using the statutory Biodiversity Metric (or the Small Sites Metric for smaller schemes), prepared by a qualified ecologist.
Learn more →Planning Statement / Supporting Statement
Often requiredSets out the planning policy case for the proposal — often combined with, or referencing, the Design & Access Statement on larger schemes.
Sustainable Drainage Strategy (SuDS)
Often requiredSets out how surface water will be managed sustainably where a development materially increases hard surfacing or impermeable area.
Statement of Community Involvement (SCI)
Often requiredSets out how the local community was consulted before submission. Typically required for major applications and schemes subject to Environmental Impact Assessment.
Learn more →Energy and Sustainability Statement
Often requiredDemonstrates how the development meets local and national energy efficiency and carbon reduction policy requirements.
Learn more →Retail Impact Assessment
Often requiredAssesses the effect of a retail or leisure proposal on the vitality and viability of existing town centres, required above a locally set floorspace threshold.
Learn more →Biodiversity Net Gain (BNG) Metric
Sometimes requiredRequired where the change of use involves habitat loss, external works, or an increase in built footprint — a pure change of use with no external works is normally exempt.
Learn more →Flood Risk Assessment
Sometimes requiredAn assessment of flood risk to and from the site, and how it will be managed.
Sequential Test (Flood Risk)
Sometimes requiredWhere a site is in a medium or high flood risk zone, this demonstrates that no reasonably available site at lower flood risk could accommodate the development instead.
Learn more →Sequential Test (Retail & Town Centre Uses)
Sometimes requiredRequired where a retail, leisure or other main town centre use is proposed outside a defined town centre, showing that no suitable town centre or edge-of-centre site is available.
Learn more →Tree survey / arboricultural report
Sometimes requiredNeeded where trees on or near the site could be affected, particularly those protected by a Tree Preservation Order or within a conservation area.
Ecology survey / Preliminary Ecological Appraisal (PEA)
Sometimes requiredMay be required where the site or nearby habitat could support protected species (bats, great crested newts, etc.), and often feeds into the BNG metric.
Learn more →Noise Impact Assessment
Sometimes requiredAssesses noise affecting the proposed development (e.g. from a road, railway or industrial use) or noise generated by it affecting neighbours, and any mitigation needed.
Air Quality Assessment
Sometimes requiredAssesses the impact of the development on local air quality, and the impact of existing air quality on future occupants — particularly relevant near busy roads.
Daylight & Sunlight Assessment (BRE Guidelines)
Sometimes requiredAssesses the effect of a proposed building's scale and massing on the daylight and sunlight received by neighbouring properties, following BRE methodology.
Landscape and Visual Impact Assessment (LVIA)
Sometimes requiredAssesses the effect of a development on the landscape character of an area and on views from surrounding vantage points.
Learn more →Transport Statement, Transport Assessment or Travel Plan
Sometimes requiredRequired for developments likely to generate significant additional traffic or that raise access or parking concerns — the level of detail scales with the size of the scheme.
Learn more →Transport Statement, Transport Assessment or Travel Plan
Always requiredHighways and transport infrastructure schemes are assessed on their traffic, access and movement impacts as a matter of course — a Transport Statement or full Transport Assessment (with a Travel Plan for larger schemes) is expected with every application, not just where a threshold is crossed.
Learn more →Contamination / ground conditions report
Sometimes requiredRequired where the site has a history of industrial, agricultural or other potentially contaminative use.
Fire Statement
Sometimes requiredSets out the fire safety strategy for a building, required for taller or higher-risk residential buildings under the Building Safety Act regime.
Construction Management Plan
Sometimes requiredSets out how construction traffic, deliveries, hours of working, dust and noise will be managed to limit disruption to neighbours and the road network.
Odour / Manure Management Statement
Sometimes requiredSets out how odour and waste from horses or livestock will be managed where a facility is close to neighbouring properties.
Learn more →Energy and Sustainability Statement
Sometimes requiredDemonstrates how the development meets local and national energy efficiency and carbon reduction policy requirements. Not a national requirement for single dwellings, but increasingly required by London boroughs and some southern authorities.
Learn more →Glint & Glare Assessment
Sometimes requiredAssesses reflection from solar panels affecting nearby roads, railways, or airfields/airports — commonly requested by highways and aviation consultees.
Learn more →Shadow Flicker Assessment
Sometimes requiredAssesses the effect of moving turbine blades casting intermittent shadows on nearby homes and workplaces at certain times of day.
Learn more →Battery Safety Management Statement
Sometimes requiredSets out fire and thermal-runaway risk mitigation for a battery energy storage system (BESS), typically prepared with input from the local fire and rescue service.
Learn more →Frequently Asked Questions
Is this checklist specific to my council?
No — this tool gives generic national guidance based on your type of development. Every council also publishes its own local validation list, which can require additional documents. Contact us and we'll confirm exactly what your specific council needs.
Is this checklist a substitute for professional advice?
No. It's a starting point to help you understand roughly what to expect. Getting the detail wrong — the wrong scale of drawing, an incomplete Design & Access Statement, a missing survey — is one of the most common reasons applications are invalidated or delayed.
How is this different from the invalid application tool?
This checklist is for anyone planning ahead, before they've submitted anything. If your council has already told you your application is invalid, or you want a fast fix, use our invalid planning application tool instead.
What is a BNG metric and do I need one?
A BNG (Biodiversity Net Gain) metric is the statutory calculation, using Natural England's Biodiversity Metric or the simplified Small Sites Metric, that shows a development delivers at least a 10% net gain in biodiversity value. It has been mandatory for most planning applications in England since February 2024, with limited exemptions such as householder applications. See our dedicated Ecology & BNG service for full detail.
What is a Sequential Test in planning?
'Sequential Test' refers to two different national policy tests. A flood risk sequential test shows that no reasonably available site at lower flood risk could accommodate your development, and applies to sites in Flood Zone 2 or 3. A retail/town centre sequential test applies to retail, leisure and other main town centre uses proposed outside a defined town centre, showing no suitable town centre or edge-of-centre site is available.
When do I need a Noise Impact Assessment?
A Noise Impact Assessment is typically needed where a site is affected by an existing noise source (a busy road, railway, industrial use or licensed premises), or where your proposal would introduce a noisy use near existing homes. It assesses the noise impact and sets out any mitigation needed to protect future or existing residents.
Want more detail on each item? Read our guide to planning application documents →
Already Been Told Your Application Is Invalid?
Use our dedicated tool to get it validated fast.
Check My Application